smc4761
Well-Known Member
- Messages
- 1,039
- Type of diabetes
- Type 1
- Treatment type
- Insulin
They haven't finished yet and are coming in Mon to wire the boiler.
It's taken so long because a new boiler was installed so drilling thru the wall for the flue, pipes, removing the immersion heater and a whole load of pipes as well as taking out the old boiler which was behind the fire and taking the fire out too. A very big job that's going to cost oodles............. but I've got warm towels, heat and hot water.
BG still beastly
I had much the same down to my home. Removed the old immersion heater, removed the old water tank from the attic, installed a new combi boiler in cupboard downstairs, connected flue to outside wall. I am sure it only took around 2 days. Hope they are not ripping you off.
High BG maybe down to stress with all the work. ? Hope they improve. Big hug